Back to All Events

Passive Fire Compliance Best Practice Workshop

Join other industry experts at our half day workshop led by Peter Blain, where we’ll go step by step to understand best practice from design through to handover while avoiding the expenses beyond, with real-world examples and round-table discussions to address challenges and create your own ‘how to implement’ processes.

Who should attend:

Professionals in design, construction, inspection, and certification or anyone interested in minimising defects.

Event program:

Throughout the morning, we will discuss and find solutions for compliance challenges including:

Introduction and Breakfast - 7 oclock sharp.

Design and pre-planning stage

  • Identifying issues in drawings, BA requirements, and compartmentation

  • Fire Engineering – FERs and performance solutions

  • Selection and preapproval of systems

  • Case study – discussion and Q&A

Onsite works commencing stage

  • Onsite training and quality expectations

  • Construction sequencing, riser construction, and service clash challenges

  • Installation guides, ITP / checklists

  • Case study – discussion and Q&A

Morning tea

Ongoing construction stage

  • Navigating inspection protocols

  • Solutions to sequencing and buildability challenges

  • Inspections / managing defect close outs and creating evidence

  • Case study – discussion and Q&A

Handover stage – documentation, registers, and certification

  • Penetration labels and registers - how to get it right

  • Certification - Cutting through the misconceptions, building certifiers expectations

  • Self certification vs third party certification oversight

  • Case study – discussion and Q&A

Post completion defects

  • How much do post completion defects really cost

  • How to pass a 12-month DLP inspection

  • Case study – discussion and Q&A